Design class: BudgetValidation status: Data validated

Windbreak Shelter

A roof with a back and one side panel facing the wind and a raised base. It gives daytime cover from wind and rain but is not a winter sleeping shelter.

A warm shelter that gets damp can be worse than a simpler one that stays dry.

“Data validated” means only the data and calculations are checked; the model has not been built or tested physically.

Capacity2–4
Outside size900 × 600
BuildBeginner
Time (estimate)2 h–4 h
model v1.0.0compiler P1.0.0plan dfd62ef6d4505ac2Shade structureWind · Rain
900 mm

This model has no 3D view; the drawing and dimensions below fully describe the construction.

Who this is for
  • For beginners with basic tools and a small budget.
  • For 2 cats (up to 4), including community cats.
When not to use it
  • As a sleeping shelter: this is an auxiliary structure.
  • For young, old, sick or unacclimated animals without extra protection and supervision.
Tools and calculations
Required tools
Hand saw, Drill
Budget class
Low
Location
Exposed outdoor spot
Supported calculations
Geometry, Bill of materials, Cut list, Sheet nesting, Cost estimate, Drawing, Build guide
Build time is a planning estimate, not a promise.
Geometry

Dimensions

Front, side and top views. Outside size 900 × 600 mm, front height 612 mm, rear 512 mm.A · FRONT VIEWB · SIDE VIEWC · PLAN900 mm712 mmwater runs off to the rear →600 mm612 mm900 mm
Text equivalent of the drawing
Outside size (W × D)900 × 600 mm
Height front / rear612 / 512 mm
Raised off the ground100 mm
Chambers1
Geometry typederived from canonical dimensions
Bill of materials · compiler output

What you have and what to obtain

Quantities come from the model geometry; items marked as assumptions are planning allowances. Reused material must pass the checklist.

Fill in “My workshop” to see what you still need to buy.

My workshop
MaterialNeededOwnedStatus
OSB/3 board1 sheets–Buy
Solid softwood (battens, studs)9.04 m–Buy
Roofing felt0.94 m²–Buy
Wood screws1 pack–Buy
  • OSB/3 board1 sheetssheet nesting · 1 × 2500 × 1250 mm (planning format; check with your supplier).
  • Solid softwood (battens, studs)9.04 mfrom geometry · Total length from the cut list + 10% allowance.
  • Roofing felt0.94 m²assumption · Roof area + 15%.
  • Wood screws1 packassumption · Joining the frame and the roof.
Cut list

Parts to cut

IDPartDimensionsQty
canopyCanopy · OSB/3 board1060 × 768 × 12 mm1
back-panelBack panel · OSB/3 board900 × 500 × 12 mm1
side-panelSide panel · OSB/3 boardsloped top edge600 × 600/500 × 12 mm1
platform-topRaised bed · OSB/3 board900 × 600 × 12 mm1
leg-frontFront post45 × 45 mm · 600 mm2
leg-rearRear post45 × 45 mm · 500 mm2
top-rail-widthTop rail across the width38 × 58 mm · 900 mm2
top-rail-depthTop rail along the depth38 × 58 mm · 608 mm2
platform-rail-widthBed frame across the width38 × 58 mm · 900 mm2
platform-rail-depthBed frame along the depth38 × 58 mm · 600 mm2
Sheet nesting

Parts on sheets

Sheet formats are planning assumptions; check your supplier's format. Sloped parts occupy their rectangular envelope.

OSB/3 board · 12 mm1 × 2500 × 1250 mm

canopyback-panelplatform-topside-panel
Sheet 1 · 68% used
Water and moisture

Weather exposure

A warm shelter that gets damp can be worse than a simpler one that stays dry. This is an explanation, not a condensation calculation.

  • Ground contactRaised about 100 mm off the ground.
  • Rain splashHigh enough that rain splash from the ground does not hit the floor.
  • Roof drainageThe roof falls from the entrance to the rear, so water runs off away from the entrance.
  • Rain at the entranceOpen structure without an entrance.
  • DryingCan be opened to dry out and change bedding.
  • Absorbent materialInterior surfaces do not absorb much moisture.
  • Maintenance accessAccess for checks and cleaning is simple.
Local price profile

Cost estimate

Quantities come from the model. Prices are not fabricated: enter what you actually pay locally and the estimate stays in your browser.

Prices entered: 0 / 4
OSB/3 board1 × 2500 × 1250 mm (planning format; check with your supplier).
1 sheetRSD 0
Solid softwood (battens, studs)Total length from the cut list + 10% allowance.
9.04 mRSD 0
Roofing feltRoof area + 15%.
0.94 m²RSD 0
Wood screwsJoining the frame and the roof.
1 itemRSD 0
Estimate from entered pricesRSD 0

Sheet, XPS, framing and hardware quantities come from the compiler. The estimate still excludes delivery, tools, labor, local taxes and unforeseen losses beyond the stated allowances. PROVISIONAL and product-specific items remain explicitly labeled.

Placement

Check the spot

Tick what applies to the chosen spot
No obvious issue detected

This is not a safety certificate for the spot: it only means none of the listed questions is ticked.

Bedding

What goes inside

Maintenance

Inspection schedule

  • MonthlyCheck the roof covering, overlaps and that water runs off at the rear, away from the entrance.
  • MonthlyCheck that screws and nails are tight and no tip protrudes.
  • MonthlyCheck edges: no splinters, cracks or swollen areas.
  • Each seasonClean the interior; service access must allow cleaning without dismantling.
Upgrade path

Where to go next

Each step states what you add, what you gain and what stays limited. A new model has a new plan ID; changing an existing build has no canonical plan.

No upgrade path is defined for this model yet.

Don't have this material?

OSB/3 board · 12 mm
  • OSB/4 boardThe substitute changes the construction (thickness, strength or water protection); parts and joints must be re-planned.
  • Exterior plywoodThe substitute changes the construction (thickness, strength or water protection); parts and joints must be re-planned.
Roofing felt
  • Bituminous membraneThe substitute changes the construction (thickness, strength or water protection); parts and joints must be re-planned.
  • EPDM membraneThe substitute changes the construction (thickness, strength or water protection); parts and joints must be re-planned.
All substitutes and material limits
Build sequence

Build steps

Progress is stored in this browser against the exact plan ID; it works offline once the page has been opened.

0 / 5steps completed
  1. Build the frame

    Assemble the posts and top rails so the front is higher than the rear. The frame must stand firmly; anchor it if needed.

  2. Fit the canopy

    Fix the canopy with its overhang. For summer shade choose a light finish; dark and metal surfaces heat up strongly in sun.

  3. Wind and rain panels

    Fit closed panels only on the side the wind or rain comes from. The front stays open.

  4. Raised bed

    A bed raised off the ground lets air move beneath the animal and keeps it away from damp or hot ground.

  5. Choose the spot and secure it

    Set it against a wall or fence, out of the wind, away from roof runoff and roaming dogs. Weight or secure lightweight shelters. Check the spot with the placement checklist.

Provenance

Sources and verification status

A source supports a guideline or material value, but it does not confirm this specific model. Container sizes are assumptions and build time is a planning estimate.

  1. Data validatedcurrent
  2. Geometry validatednot confirmed
  3. Engineering reviewnot confirmed
  4. Physical prototypenot confirmed
  5. Field validationnot confirmed