Design class: BudgetValidation status: Data validated

Summer Cross-Vent Shelter

An uninsulated box with an entrance at the front and a second opening at the rear so hot air can move through, as Alley Cat Allies recommends for summer. It must stand in full shade.

Extreme heat needs a cooler safe space, not a better closed house. Provide shade, water and freedom to leave.

“Data validated” means only the data and calculations are checked; the model has not been built or tested physically.

Capacity1–2
Outside size750 × 550
BuildBeginner
Time (estimate)3 h–5 h
model v1.0.0compiler P1.0.0plan e51ca7c80834ec14Panel boxSummer · Rain
750 mm

This model has no 3D view; the drawing and dimensions below fully describe the construction.

Who this is for
  • For beginners with basic tools and a small budget.
  • For one cat (up to 2), including community cats.
  • For summer months, as shade and cover with water and freedom to leave.
When not to use it
  • At a fully exposed spot: it needs shelter from wind and rain (a wall, fence or eaves).
  • As a winter shelter: it has no insulation for cold nights.
  • As a replacement for a cooler safe space during extreme heat.
  • For young, old, sick or unacclimated animals without extra protection and supervision.
Tools and calculations
Required tools
Hand saw, Jigsaw +1
Budget class
Low
Location
Sheltered outdoor spot
Supported calculations
Geometry, Bill of materials, Cut list, Sheet nesting, Thermal estimate, Cost estimate, Drawing, Build guide
Build time is a planning estimate, not a promise.
Geometry

Dimensions

Front, side and top views. Outside size 750 × 550 mm, front height 500 mm, rear 440 mm.A · FRONT VIEWB · SIDE VIEWC · PLAN750 mm580 mmwater runs off to the rear →550 mm520 mm750 mminside 726 × 526 × 446 mm
Text equivalent of the drawing
Outside size (W × D)750 × 550 mm
Height front / rear500 / 440 mm
Raised off the ground80 mm
Interior726 × 526 × 446 mm
Entrance1 × 150 × 180 mm, sill 80 mm
Chambers1
Geometry typederived from canonical dimensions
Bill of materials · compiler output

What you have and what to obtain

Quantities come from the model geometry; items marked as assumptions are planning allowances. Reused material must pass the checklist.

Fill in “My workshop” to see what you still need to buy.

My workshop
MaterialNeededOwnedStatus
Exterior plywood2 sheets–Buy
Solid softwood (battens, studs)3.17 m–Buy
EPDM membrane0.75 m²–Buy
Sealant1 pack–Buy
Wood screws1 pack–Buy
  • Exterior plywood2 sheetssheet nesting · 2 × 2500 × 1250 mm (planning format; check with your supplier).
  • Solid softwood (battens, studs)3.17 mfrom geometry · Total length from the cut list + 10% allowance.
  • EPDM membrane0.75 m²assumption · Roof area + 15% for overlaps and edges; match overlaps and slope to the product instructions.
  • Sealant1 packassumption · Sealing exterior edges and joints.
  • Wood screws1 packassumption · Exterior screws; shorter than the wall build-up so they do not protrude inside.
Cut list

Parts to cut

IDPartDimensionsQty
shell-floorFloor · Exterior plywood750 × 550 × 12 mm1
shell-frontFront wall · Exterior plywood750 × 476 × 12 mm1
shell-rearRear wall · Exterior plywood750 × 416 × 12 mm1
shell-sideSide wall · Exterior plywoodsloped top edge526 × 475/417 × 12 mm2
shell-roofRoof · Exterior plywood910 × 713 × 12 mm1
corner-batten-frontFront corner batten38 × 38 mm · 476 mm2
corner-batten-rearRear corner batten38 × 38 mm · 416 mm2
raise-battenRaising batten45 × 80 mm · 550 mm2
Sheet nesting

Parts on sheets

Sheet formats are planning assumptions; check your supplier's format. Sloped parts occupy their rectangular envelope.

Exterior plywood · 12 mm2 × 2500 × 1250 mm

shell-roofshell-floorshell-frontshell-rear
Sheet 1 · 54% used
shell-sideshell-side
Sheet 2 · 15% used
Layers and thermal

Known and unknown layers

Complete estimate: every layer has a sourced thermal conductivity.

Wall

  • Exterior plywood · 12 mmR 0.07

Known-layer resistance: 0.07 m²K/W · U 4.15 W/m²K

Floor

  • Exterior plywood · 12 mmR 0.07

Known-layer resistance: 0.07 m²K/W · U 3.56 W/m²K

Roof

  • Exterior plywood · 12 mmR 0.07

Known-layer resistance: 0.07 m²K/W · U 4.74 W/m²K

Not included
  • Air leakage through the entrance and joints
  • Thermal bridges through battens, edges and fasteners
  • Moisture, condensation and property changes of damp material
  • Heat produced by the animal
  • Wind and transient temperature changes
Assumptions
  • Thin layers without a sourced λ (roof covering, film, mat) are not counted.

The estimate is not a temperature guarantee and does not claim the shelter is safe to any temperature.

Water and moisture

Weather exposure

A warm shelter that gets damp can be worse than a simpler one that stays dry. This is an explanation, not a condensation calculation.

  • Ground contactRaised about 80 mm off the ground.
  • Rain splashRain splash from the ground can reach the floor and lower edges; protect the edges.
  • Roof drainageThe roof falls from the entrance to the rear, so water runs off away from the entrance.
  • Rain at the entranceThe entrance sill is 80 mm above the floor.
  • DryingWithout a service opening drying and cleaning are harder; change bedding through the entrance.
  • Absorbent materialInterior surfaces do not absorb much moisture.
  • Maintenance accessLeave room around the house for checks and cleaning.
Local price profile

Cost estimate

Quantities come from the model. Prices are not fabricated: enter what you actually pay locally and the estimate stays in your browser.

Prices entered: 0 / 5
Exterior plywood2 × 2500 × 1250 mm (planning format; check with your supplier).
2 sheetsRSD 0
Solid softwood (battens, studs)Total length from the cut list + 10% allowance.
3.17 mRSD 0
EPDM membraneRoof area + 15% for overlaps and edges; match overlaps and slope to the product instructions.
0.75 m²RSD 0
SealantSealing exterior edges and joints.
1 itemRSD 0
Wood screwsExterior screws; shorter than the wall build-up so they do not protrude inside.
1 itemRSD 0
Estimate from entered pricesRSD 0

Sheet, XPS, framing and hardware quantities come from the compiler. The estimate still excludes delivery, tools, labor, local taxes and unforeseen losses beyond the stated allowances. PROVISIONAL and product-specific items remain explicitly labeled.

Placement

Check the spot

Tick what applies to the chosen spot
No obvious issue detected

This is not a safety certificate for the spot: it only means none of the listed questions is ticked.

Bedding

What goes inside

  • AcceptableStrawRepels moisture and stays loose. Replace when damp, compacted or soiled, and when seasons change.
  • AcceptableTowelAbsorbs moisture like a blanket. Wash and swap as soon as it is damp.
  • AcceptableWood shavingsPartly absorbs moisture. Change when damp or compacted.
  • AcceptableWashable dog bedDepends on fabric; textile absorbs moisture. Dry or swap as soon as it is damp.
Maintenance

Inspection schedule

  • WeeklyCheck for water or dampness on the floor and walls, especially under the entrance.
  • After stormsAfter rain or snow check the interior and the ground under the shelter.
  • MonthlyCheck the roof covering, overlaps and that water runs off at the rear, away from the entrance.
  • MonthlyCheck that screws and nails are tight and no tip protrudes.
  • MonthlyCheck edges: no splinters, cracks or swollen areas.
  • WeeklyCheck that the spot is still fully shaded in the hottest part of the day and that fresh water is nearby.
  • Each seasonClean the interior; service access must allow cleaning without dismantling.
Upgrade path

Where to go next

Each step states what you add, what you gain and what stays limited. A new model has a new plan ID; changing an existing build has no canonical plan.

No upgrade path is defined for this model yet.

Don't have this material?

Exterior plywood · 12 mm
  • OSB/3 boardThe substitute changes the construction (thickness, strength or water protection); parts and joints must be re-planned.
  • OSB/4 boardThe substitute changes the construction (thickness, strength or water protection); parts and joints must be re-planned.
All substitutes and material limits
Build sequence

Build steps

Progress is stored in this browser against the exact plan ID; it works offline once the page has been opened.

0 / 8steps completed
  1. Cut the outer panels

    Following the cut list, cut the floor, walls and roof from 12 mm exterior plywood. Side walls are sloped: 500 mm overall at the front and 440 mm at the rear, so the roof falls to the rear.

  2. Cut the entrance

    Cut a 150 mm × 180 mm opening through the front wall and every inner layer, with the sill 80 mm above the floor so rain and snow stay out. Face the entrance away from the prevailing wind. Cover or sand sharp edges.

  3. Assemble the box

    Front and rear walls run the full width and the sides fit between them. Join the walls on the floor with corner battens, glue and screws shorter than the wall build-up.

  4. Roof

    Fix the roof. Fit the roof covering per the product instructions, with overlaps and protected edges.

  5. Protect the outside

    Coat outside faces and edges with a wood protection finish and let it fully cure before use.

  6. Raise the shelter off the ground

    Set the shelter on two battens, about 80 mm above the ground, so the floor does not touch cold, wet ground. Check that it does not rock.

  7. No bedding

    In summer leave a clean, cool surface without heat-holding bedding.

  8. Place in full shade

    The spot must be shaded through the hottest part of the day, on grass or soil, not on hot concrete or metal. Fresh water must be nearby and the animal must be free to move somewhere cooler.

Provenance

Sources and verification status

A source supports a guideline or material value, but it does not confirm this specific model. Container sizes are assumptions and build time is a planning estimate.

  1. Data validatedcurrent
  2. Geometry validatednot confirmed
  3. Engineering reviewnot confirmed
  4. Physical prototypenot confirmed
  5. Field validationnot confirmed