Wall
- OSB/3 board · 12 mmR 0.09
- EPS foam board · 50 mmR 1.32
- Interior plywood lining · 9 mmR 0.05
- Wooden pallet · 144 mm (assumed)unknown
Known-layer resistance: 1.46 m²K/W
The same pallet frame as the basic version, with EPS in the cavities, OSB cladding outside and an interior lining. Floor and roof are not insulated.
This is an auxiliary outdoor shelter. During dangerous cold or heat give the dog a safe indoor space.
“Data validated” means only the data and calculations are checked; the model has not been built or tested physically.
This model has no 3D view; the drawing and dimensions below fully describe the construction.
| Outside size (W × D) | 1200 × 812 mm |
|---|---|
| Height front / rear | 1079 / 1019 mm |
| Raised off the ground | 144 mm |
| Interior | 894 × 647 × 791 mm |
| Entrance | 1 × 400 × 600 mm, sill 0 mm |
| Chambers | 1 |
| Geometry type | derived from canonical dimensions |
Quantities come from the model geometry; items marked as assumptions are planning allowances. Reused material must pass the checklist.
Fill in “My workshop” to see what you still need to buy.
My workshoppallet-floor-1Pallet section (floor) from pallet 1Each cut must leave a stringer or block at its end; adapt to the real pallet.1200 × 800 × 144 mm1pallet-back-2Pallet section (back) from pallet 2Each cut must leave a stringer or block at its end; adapt to the real pallet.1200 × 800 × 144 mm1pallet-side_left-3Pallet section (side left) from pallet 3Each cut must leave a stringer or block at its end; adapt to the real pallet.800 × 800 × 144 mm1pallet-front_left-4Pallet section (front left) from pallet 3Each cut must leave a stringer or block at its end; adapt to the real pallet.400 × 800 × 144 mm1pallet-side_right-5Pallet section (side right) from pallet 4Each cut must leave a stringer or block at its end; adapt to the real pallet.800 × 800 × 144 mm1pallet-front_right-6Pallet section (front right) from pallet 4Each cut must leave a stringer or block at its end; adapt to the real pallet.400 × 800 × 144 mm1roofRoof · OSB/3 board1360 × 1106 × 15 mm1clad-backOuter cladding (back) · OSB/3 board1200 × 800 × 12 mm1clad-sideOuter cladding (side) · OSB/3 board800 × 800 × 12 mm2clad-front-1Outer cladding (front-1) · OSB/3 board400 × 800 × 12 mm1clad-front-2Outer cladding (front-2) · OSB/3 board400 × 800 × 12 mm1ins-back-r1c1Pallet cavity insulation (back) · EPS foam boardSegment 1/2, 1/2; butt-join.600 × 400 × 50 mm1ins-back-r1c2Pallet cavity insulation (back) · EPS foam boardSegment 1/2, 2/2; butt-join.600 × 400 × 50 mm1ins-back-r2c1Pallet cavity insulation (back) · EPS foam boardSegment 2/2, 1/2; butt-join.600 × 400 × 50 mm1ins-back-r2c2Pallet cavity insulation (back) · EPS foam boardSegment 2/2, 2/2; butt-join.600 × 400 × 50 mm1ins-side-r1c1Pallet cavity insulation (side) · EPS foam boardSegment 1/2, 1/1; butt-join.800 × 400 × 50 mm2ins-side-r2c1Pallet cavity insulation (side) · EPS foam boardSegment 2/2, 1/1; butt-join.800 × 400 × 50 mm2ins-front-1Pallet cavity insulation (front-1) · EPS foam boardCut to fit between the pallet stringers.400 × 800 × 50 mm1ins-front-2Pallet cavity insulation (front-2) · EPS foam boardCut to fit between the pallet stringers.400 × 800 × 50 mm1lin-backInterior lining (back) · Interior plywood lining1200 × 800 × 9 mm1lin-sideInterior lining (side) · Interior plywood lining800 × 800 × 9 mm2lin-front-1Interior lining (front-1) · Interior plywood lining400 × 800 × 9 mm1lin-front-2Interior lining (front-2) · Interior plywood lining400 × 800 × 9 mm1lin-floorInterior lining (floor) · Interior plywood lining1200 × 800 × 9 mm1roof-fall-battenTapered roof-fall batten38 × 60 mm · 944 mm2front-headerHeader board above the entrance24 × 100 mm · 1200 mm1corner-tiesCorner tie battens38 × 38 mm · 800 mm4Sheet formats are planning assumptions; check your supplier's format. Sloped parts occupy their rectangular envelope.
Partial estimate: some layers are unknown, so no U-value is calculated. Only the resistance of known layers is shown.
Known-layer resistance: 1.46 m²K/W
The estimate is not a temperature guarantee and does not claim the shelter is safe to any temperature.
A warm shelter that gets damp can be worse than a simpler one that stays dry. This is an explanation, not a condensation calculation.
Quantities come from the model. Prices are not fabricated: enter what you actually pay locally and the estimate stays in your browser.
Sheet, XPS, framing and hardware quantities come from the compiler. The estimate still excludes delivery, tools, labor, local taxes and unforeseen losses beyond the stated allowances. PROVISIONAL and product-specific items remain explicitly labeled.
This is not a safety certificate for the spot: it only means none of the listed questions is ticked.
Each step states what you add, what you gain and what stays limited. A new model has a new plan ID; changing an existing build has no canonical plan.
Previous step: Pallet Basic Dog House
Progress is stored in this browser against the exact plan ID; it works offline once the page has been opened.
Every pallet must pass the checklist: no stains, chemical smell, oil, rot or mould. An ISPM 15 mark confirms only a phytosanitary treatment, not the pallet's history.
Cut sections per the cut list so a stringer or block remains at each end. Remove protruding nails and sand the edges.
Set the floor pallet level, fix the back and side sections onto it and tie the corners with battens. The front sections leave the entrance opening.
Cut insulation boards to fit between the pallet stringers and place them in the wall cavities.
Fix cladding on the outside so wind and rain cannot pass through the gaps between boards.
Fit an interior lining so the animal touches neither insulation nor rough pallet parts.
Fit two tapered battens so the roof falls 60 mm to the rear, then fix the roof board and covering. Water must run off behind the house, away from the entrance.
Loosely fill straw to a quarter or half of the interior height. Do not use hay, towels or blankets in an outdoor winter shelter: they absorb moisture and chill.
Set it against a wall or fence, out of the wind, away from roof runoff and roaming dogs. Weight or secure lightweight shelters. Check the spot with the placement checklist.
A source supports a guideline or material value, but it does not confirm this specific model. Container sizes are assumptions and build time is a planning estimate.