Design class: Standard DIYValidation status: Data validated

Cat L-Entry Vestibule

A small floorless box fitted in front of the entrance: the cat enters from the side and turns, so wind does not blow straight into the shelter. Alley Cat Allies mentions an L-shaped entry as weather protection.

A warm shelter that gets damp can be worse than a simpler one that stays dry.

“Data validated” means only the data and calculations are checked; the model has not been built or tested physically.

Capacity1
Outside size340 × 300
BuildBeginner
Time (estimate)90 min–3 h
model v1.0.0compiler P1.0.0plan be56de4c416b3db8Panel boxWinter · Wind
340 mm

This model has no 3D view; the drawing and dimensions below fully describe the construction.

Who this is for
  • For more experienced makers with power tools.
  • For one cat, including community cats.
When not to use it
  • As a sleeping shelter: this is an auxiliary structure.
  • For young, old, sick or unacclimated animals without extra protection and supervision.
Tools and calculations
Required tools
Hand saw, Jigsaw +1
Budget class
Low
Location
Exposed outdoor spot
Supported calculations
Geometry, Bill of materials, Cut list, Sheet nesting, Cost estimate, Drawing, Build guide
Build time is a planning estimate, not a promise.
Geometry

Dimensions

Front, side and top views. Outside size 340 × 300 mm, front height 320 mm, rear 300 mm.A · FRONT VIEWB · SIDE VIEWC · PLAN340 mm320 mmwater runs off to the rear →300 mm300 mm340 mminside 316 × 276 × 298 mm
Text equivalent of the drawing
Outside size (W × D)340 × 300 mm
Height front / rear320 / 300 mm
Raised off the ground0 mm
Interior316 × 276 × 298 mm
Entrance1 × 150 × 180 mm, sill 80 mm
Chambers1
Geometry typederived from canonical dimensions
Bill of materials · compiler output

What you have and what to obtain

Quantities come from the model geometry; items marked as assumptions are planning allowances. Reused material must pass the checklist.

Fill in “My workshop” to see what you still need to buy.

My workshop
MaterialNeededOwnedStatus
Exterior plywood1 sheets–Buy
Solid softwood (battens, studs)1.31 m–Buy
EPDM membrane0.15 m²–Buy
Sealant1 pack–Buy
Wood screws1 pack–Buy
  • Exterior plywood1 sheetssheet nesting · 1 × 2500 × 1250 mm (planning format; check with your supplier).
  • Solid softwood (battens, studs)1.31 mfrom geometry · Total length from the cut list + 10% allowance.
  • EPDM membrane0.15 m²assumption · Roof area + 15% for overlaps and edges; match overlaps and slope to the product instructions.
  • Sealant1 packassumption · Sealing exterior edges and joints.
  • Wood screws1 packassumption · Exterior screws; shorter than the wall build-up so they do not protrude inside.
Cut list

Parts to cut

IDPartDimensionsQty
shell-frontFront wall · Exterior plywood340 × 308 × 12 mm1
shell-rearRear wall · Exterior plywood340 × 288 × 12 mm1
shell-sideSide wall · Exterior plywoodsloped top edge276 × 307/289 × 12 mm1
shell-side-openingSide wall with opening · Exterior plywoodsloped top edge276 × 307/289 × 12 mm1
shell-roofRoof · Exterior plywood380 × 341 × 12 mm1
corner-batten-frontFront corner batten38 × 38 mm · 308 mm2
corner-batten-rearRear corner batten38 × 38 mm · 288 mm2
Sheet nesting

Parts on sheets

Sheet formats are planning assumptions; check your supplier's format. Sloped parts occupy their rectangular envelope.

Exterior plywood · 12 mm1 × 2500 × 1250 mm

Sheet 1 · 14% used
Water and moisture

Weather exposure

A warm shelter that gets damp can be worse than a simpler one that stays dry. This is an explanation, not a condensation calculation.

  • Ground contactThe floor is close to the ground; raise it onto a dry base.
  • Rain splashRain splash from the ground can reach the floor and lower edges; protect the edges.
  • Roof drainageThe roof falls from the entrance to the rear, so water runs off away from the entrance.
  • Rain at the entranceThe entrance sill is 80 mm above the floor.
  • DryingWithout a service opening drying and cleaning are harder; change bedding through the entrance.
  • Absorbent materialInterior surfaces do not absorb much moisture.
  • Maintenance accessLeave room around the house for checks and cleaning.
Local price profile

Cost estimate

Quantities come from the model. Prices are not fabricated: enter what you actually pay locally and the estimate stays in your browser.

Prices entered: 0 / 5
Exterior plywood1 × 2500 × 1250 mm (planning format; check with your supplier).
1 sheetRSD 0
Solid softwood (battens, studs)Total length from the cut list + 10% allowance.
1.31 mRSD 0
EPDM membraneRoof area + 15% for overlaps and edges; match overlaps and slope to the product instructions.
0.15 m²RSD 0
SealantSealing exterior edges and joints.
1 itemRSD 0
Wood screwsExterior screws; shorter than the wall build-up so they do not protrude inside.
1 itemRSD 0
Estimate from entered pricesRSD 0

Sheet, XPS, framing and hardware quantities come from the compiler. The estimate still excludes delivery, tools, labor, local taxes and unforeseen losses beyond the stated allowances. PROVISIONAL and product-specific items remain explicitly labeled.

Placement

Check the spot

Tick what applies to the chosen spot
No obvious issue detected

This is not a safety certificate for the spot: it only means none of the listed questions is ticked.

Bedding

What goes inside

Maintenance

Inspection schedule

  • MonthlyCheck the roof covering, overlaps and that water runs off at the rear, away from the entrance.
  • MonthlyCheck that screws and nails are tight and no tip protrudes.
  • MonthlyCheck edges: no splinters, cracks or swollen areas.
  • Each seasonClean the interior; service access must allow cleaning without dismantling.
Upgrade path

Where to go next

Each step states what you add, what you gain and what stays limited. A new model has a new plan ID; changing an existing build has no canonical plan.

No upgrade path is defined for this model yet.

Don't have this material?

Exterior plywood · 12 mm
  • OSB/3 boardThe substitute changes the construction (thickness, strength or water protection); parts and joints must be re-planned.
  • OSB/4 boardThe substitute changes the construction (thickness, strength or water protection); parts and joints must be re-planned.
All substitutes and material limits
Build sequence

Build steps

Progress is stored in this browser against the exact plan ID; it works offline once the page has been opened.

0 / 8steps completed
  1. Cut the outer panels

    Following the cut list, cut the floor, walls and roof from 12 mm exterior plywood. Side walls are sloped: 320 mm overall at the front and 300 mm at the rear, so the roof falls to the rear.

  2. Cut the entrance

    Cut a 150 mm × 180 mm opening through the front wall and every inner layer, with the sill 80 mm above the floor so rain and snow stay out. Face the entrance away from the prevailing wind. Cover or sand sharp edges.

  3. Assemble the box

    Front and rear walls run the full width and the sides fit between them. Join the walls on the floor with corner battens, glue and screws shorter than the wall build-up.

  4. Roof

    Fix the roof. Fit the roof covering per the product instructions, with overlaps and protected edges.

  5. Protect the outside

    Coat outside faces and edges with a wood protection finish and let it fully cure before use.

  6. Raise the shelter off the ground

    Set the shelter on a dry, level base, about 0 mm above the ground, so the floor does not touch cold, wet ground. Check that it does not rock.

  7. No bedding

    In summer leave a clean, cool surface without heat-holding bedding.

  8. Choose the spot and secure it

    Set it against a wall or fence, out of the wind, away from roof runoff and roaming dogs. Weight or secure lightweight shelters. Check the spot with the placement checklist.

Provenance

Sources and verification status

A source supports a guideline or material value, but it does not confirm this specific model. Container sizes are assumptions and build time is a planning estimate.

  1. Data validatedcurrent
  2. Geometry validatednot confirmed
  3. Engineering reviewnot confirmed
  4. Physical prototypenot confirmed
  5. Field validationnot confirmed